FACILITY
    SERVICES

      DYNO

    RACE TEAM
1969 Mustang Boss 302
This project was a basket case...Literally!  The car had been taken apart and not been put back together all the way.  So our team disassembled the entire car to fix every problem the best way....on the Rotisserie.  So far we have replaced 3 floors panels, an inner fender panel and a rear trunk drop off.  We assembled the suspension detailing every part as we went.  So here are some of the pictures to document our work...
1969 Boss Mustang